Risk Assessment

Overview

A Risk Assessment is a tool to identify risk in relation to conducting Plant and Soil Health investigations in the Urban Forest environment. Assessing site details, confirming the individual participants and to document the project has been assessed for acceptable risk to the participants and or the general public, to ensure a safe outcome for all.

Testing the multispeq devices prior to the engagement of collecting measures ensures the experiment measurements will be successful.

Using the Photosyq platform to complete A Risk Assessment is also an opportunity to familiarize participants with the particular Urban Forest site conditions and document information relevant to future follow-up measures. The PhotosynQ platform will provide a data facility to store/retrieve and further analyze information pertaining to - Urban Forest plant and soil health data collection, project site detail and risk parameters.

Protocols

Leaf Photosynthesis MultispeQ V1.0

Summary

Measures many photosynthesis-related parameters in <15 seconds, including:

  • Chlorophll Fluorescence: Phi2, PhiNPQ, PhiNO, NPQt, qL, LEF
  • Relative Chlorophyll: SPAD
  • Proton Motive Force: ECSt, vH+, gH+
  • Absorbance at: 450, 535, 605, 650, 730, 850, 880, and 940nm.
  • Leaf Thickness (in mm), angle, and cardinal direct...

Questions

  1. Type of Data Collection (Multiple Choice)
  2. Site Detail (Short Answer)
  3. Names of Participants In Group..use , (Short Answer)
  4. Total number of participants in group (Multiple Choice)
  5. Photo of group/selfie (Take a Picture)
  6. Risk level (Multiple Choice)
  7. Leaf Access (Multiple Choice)
  8. Access To Root - Zone (Multiple Choice)
  9. Underground Service proximity (Multiple Choice)
  10. Is there risk of penetrating service infrastructure? (Multiple Choice)
  11. What will you do to avoid Services? (Short Answer)
  12. Pedestrian Movement (Multiple Choice)
  13. Vehicle Movement (Multiple Choice)
  14. Road Proximity (Multiple Choice)
  15. Are you close to cyclist path? (Multiple Choice)
  16. Are you involved in - Data Collection Workshop? (Multiple Choice)
  17. Are you involved in a PhotosynQ Presentation? (Multiple Choice)
  18. Is there an indoor facility? (Multiple Choice)
  19. Is there a projector? (Multiple Choice)
  20. General Comments (Short Answer)
  21. Do You need to set a barricade perimeter for public safty? (Multiple Choice)
  22. Length of project data set (Multiple Choice)
  23. Is extreme heat and exhaustion a factor to consider? (Multiple Choice)
  24. Do you have drinking water? (Multiple Choice)
  25. Do you have sun protection? (Multiple Choice)

Locations

Team

Thumb facebook personal pix
Project Lead (1)
Thumb sam 0645   copy   copy  2
Collaborator (0)
Thumb 012409 pbi 160 low low res headshot
Collaborator (0)
Thumb fb img 1473544138663
Collaborator (0)